The project encompassed the construction of:
3 – No reinforced concrete reservoirs were constructed . The reservoirs consist of pre – cast concrete wall panels , columns and insitu base , ring beam and roof slab .
2 – No pump house / control buildings . The buildings construct consists of reinforced concrete foundation , rendered cavity wall blocks and traditional cut / tiled roof .
1 – No steel pump house / control building.
– Approximately 600m of 180mm polyethylene pipe .
– Installation of telemetry equipment
Project Team:
Client: Belfast County Council
Engineer: Grenergy Engineering Consultant
Contract Value:
€630,000
Construction Period:
December 2009 to June 2010