Description: Part of Grenergy Projects initiative was the introduction of cement-basedconcrete for road construction In Mozambique due to the rising cost of roads built with asphaltand their failure shortly after construction. Client: European Union Cost: $5.3 MILLION
Client: Avalanche Homes Description: Infrastructural work and services- road expansion and laying of Interlocked andasphalt road network into the estate. Handled all the drainages, waste and water treatmentplant construction for the entire estate. Cost: $3.12 m
Pavement Scarification: Road Reconstruction And Repair Road Markings Project Team: Client – Cork County Council Contract Value: €297,198.47 Construction Period: 9th November 2009 – 15th January 2010
Upgrade of blakestown way to incorporate a south bound bus corrider and upgrade of footway and cycleway facilities. To include site clearance removal of old footpath, installation of new services public lighting, traffic lights, toucan crossings and bus shelters together with the full construction of new footpath, cycle track and full plane out and overlay […]
Upgrading and repair to pedestrian footpaths and cycle tracks in Carrigaline. Project Team: Client – Cork County Council Contract Value: € 1.2m Construction Period: November 2009 – January 2010
The project encompassed the construction of: 3 – No reinforced concrete reservoirs were constructed . The reservoirs consist of pre – cast concrete wall panels , columns and insitu base , ring beam and roof slab . 2 – No pump house / control buildings . The buildings construct consists of reinforced concrete foundation , rendered […]
Overview Civil works contract for the construction of a 90 berth marina adjacent to the River Shannon in the Village of Tarmonbarry . Construction involved the excavation of 40,000m3 in the marina and 25,000m3 of excavation in the inlet channel leading from the River Shannon . This was achieved by the construction of a temporary […]
Overlay contract including planning when required, surface dressing, laying of new kerbing and footpaths, road markings and reflective studs. Project Team: Client – North Tipperary County Council Contract Value: €1.3 m Construction Period: September 2009 – December 2009